16 articles · Page 1 of 1
Regression / OLS
Suppose two cases differ by one unit on x but have the same values of z and m. How much does the fitted outcome differ? Multiple regression can answer that question. It cannot tell you what would happen if you intervened to change x unless the study supports that interpretation.
Regression / OLS
A regression can run successfully even when a number was mistyped. It can also flag a surprising observation that is perfectly valid. Find the original row and check whether the value was recorded correctly before deciding how to handle it.
Regression / Logistic
Your logistic regression says the event odds are 1.74 times as high for a one-unit difference in a predictor. A colleague puts “the probability increased by 74 percentage points” on a slide. Before presenting it, ask: 74 percentage points from what starting probability? The two measures are different, and the starting profile matters.
Regression / Inference
A result page that says “1,000 bootstrap draws requested” tells you what you asked the software to do. It does not tell you how many draws produced usable estimates. That distinction matters, particularly with few binary events or a rare predictor level.
Regression / IPMA
A service team notices that resolution quality has low performance on an importance–performance map. Can it promise higher satisfaction after investing in resolution? The map supplies a question worth investigating. Cost, feasibility and causation still require evidence.
Regression / PROCESS
If x is related to y through an intermediate measure m, you need two linked equations to describe the pathway. The product of two fitted slopes gives the indirect point estimate. It does not give its confidence interval.
Regression / PROCESS
A team expects adaptive capability to encourage managerial commitment, which helps a business develop a shared green vision and, ultimately, a competitive advantage. If you draw only that chain, you assume that every shorter route is absent. Instead, retain the competing paths so you can see what the serial route contributes separately.
Regression / PROCESS
An interaction gives you an estimate of how a slope changes. It does not, by itself, tell you the slope at a plausible value of the moderator. Before saying that a relationship is stronger under one condition, identify the moderator metric and check the conditional estimate and its uncertainty.
Regression / PROCESS
Alliance-management capability may help a firm redesign its business model. Does the association between that redesign and sustainability performance get stronger when the firm is strategically flexible? This is a second-stage moderation question. It matters which arrow is moderated: placing flexibility on capability → redesign tests a different explanation.
Regression / PROCESS
Two researchers both report analysing a “Quality score” in the same data file. One averaged three raw items; the other standardised those items first and then averaged them within a subgroup. Their column names can look identical while the analysed measures and cases differ. Open the saved preparation choices before you compare their coefficients.
Regression / PROCESS
Imagine x predicts an outcome, but an unmeasured influence may affect both. In that situation, the fitted slope can be misleading even when the regression was calculated correctly. An adjusted Gaussian copula adds constructed control terms under assumptions about the dependence between the predictor and the unexplained part of the outcome equation. The comparison can inform a sensitivity analysis. It is not an independent test that tells you whether your predictor is endogenous.
PCA
You have four continuous measurements and want a shorter description. Keeping one component is simpler, but perhaps it loses too much variation. Keeping two may preserve enough without giving you four new labels. That is a reduction decision. It is not a test of how many latent factors made the measurements behave as they did.
PCA
Imagine a colleague takes the first column of the PCA loading table and uses it as a formula for scoring cases. That might not reproduce the component scores. A loading describes how a variable relates to an axis. The weights construct a coordinate, and a score tells you where a specific case sits on that axis. Those tasks remain distinct after rotation.
NCA
If companies with more digital capability tend to innovate more, would you tell a company with little capability that it cannot innovate at a high level? You would need a different analysis before saying that. An average relationship can be positive even when some low-capability companies achieve excellent results. A necessary condition claim asks whether those combinations are absent, or whether the data contain credible counterexamples.
NCA
An innovation manager sets a performance target of 80 on a 0–100 scale. You look down the Necessary Condition Analysis (NCA) table to the row marked 80%. Have you found the right row?
NCA
Suppose you have proposed that high satisfaction requires good service quality. Your scatter plot mostly agrees, except for a few respondents who report poor quality and high satisfaction. Those observations matter: one credible counterexample can challenge a strict claim that high satisfaction never occurs at low quality. But what if your research question is whether that outcome is unusual, rather than impossible?