A team expects adaptive capability to encourage managerial commitment, which helps a business develop a shared green vision and, ultimately, a competitive advantage. If you draw only that chain, you assume that every shorter route is absent. Instead, retain the competing paths so you can see what the serial route contributes separately.
Use the 210 fictional energy-business cases. The four continuous scores are CAP (adaptive capability), COMMIT (managerial commitment), VISION (shared green priorities) and ADV (competitive advantage). They are observed teaching scores, not estimated latent variables or the companies in the original study.
Build a complete graph in the proposed order
Import the CSV and confirm the 210 complete cases. Keep case_id as an identifier. Open Analyze… → Regression and select Graph-defined Path Analysis / PROCESS. Set Outcome to ADV and Focal predictor to CAP. Under Directed paths, add:
- CAP → COMMIT, CAP → VISION and CAP → ADV.
- COMMIT → VISION, COMMIT → ADV and VISION → ADV.
Read the preview as three equations. COMMIT has CAP as a predictor. VISION has CAP and COMMIT. ADV has CAP, COMMIT and VISION. Each equation includes an intercept in the reference. Do not put a mediator in Controls: that option enters a variable in every equation rather than inserting a mediator at the intended position.
To follow the documented exercise, use raw units and Case-resampling bootstrap, with 5,000 samples, one worker, seed 71008, 95% confidence and a two-sided test. Read the fit counts and specific indirect routes from the completed calculation. QuickPLS Pro energy-sector exercise.
Match each product with its own interval
The published teaching reference is calculated in R and independently checked with NumPy. It uses 5,000 whole-row resamples and percentile intervals. The same integer seed in a different engine need not reproduce the sampled rows. Treat the numbers below as external reference values, not a screenshot of the QuickPLS desktop run.
| Route from CAP to ADV | Product using the displayed slopes | Reference estimate | 95% reference interval |
|---|---|---|---|
| Through COMMIT only | 0.463 × 0.151 | 0.070 | −0.003 to 0.157 |
| Through VISION only | 0.147 × 0.302 | 0.044 | 0.003 to 0.107 |
| Through COMMIT then VISION | 0.463 × 0.468 × 0.302 | 0.065 | 0.028 to 0.112 |
The sum of the displayed indirect estimates is about 0.179. Adding the direct estimate of 0.149 gives about 0.328 as the total fitted association on these rounded numbers. Use unrounded estimates where available. To get uncertainty for the sum, sum the route estimates within each joint refit and construct its own interval; do not add endpoints from separate intervals.
Explain a sequence without claiming timing
The commitment-only route has a positive point estimate and an interval that crosses zero. The serial route is also positive and its interval does not cross zero. That does not establish that the routes differ from each other. A route difference needs an interval calculated for that difference, using estimators that retain covariance across the same fitted system.
The ordering is also part of the hypothesis, not an observation established by software. Swapping COMMIT and VISION changes the hypothesised order of the mediators. Use theory and credible timing information to justify the original order. A positive product is not evidence that commitment or vision was a necessary condition for high advantage; the linked exercise treats necessity as a separate analysis.
Try it: If the CAP → VISION arrow were omitted, which specific fitted route would disappear? The shorter route through VISION alone would no longer be part of the declared graph. Re-estimating the restricted model can also change the coefficients that remain, so do not simulate that restriction by deleting a table row.
Example report: “In the 210-case synthetic exercise, the external percentile reference for the CAP–COMMIT–VISION–ADV pathway was 0.065 (95% interval 0.028 to 0.112). We retained and reported the shorter routes separately. The estimands reflect a hypothesised ordering and do not establish the timing or causal sequence of the relationships.”