A service team notices that resolution quality has low performance on an importance–performance map. Can it promise higher satisfaction after investing in resolution? The map supplies a question worth investigating. Cost, feasibility and causation still require evidence.
QuickPLS Pro's regression IPMA uses an ordinary least squares model of a continuous outcome. Importance is the signed, unstandardized coefficient. Performance is the predictor's average position within a declared range, displayed from 0 to 100. Both come from the same complete cases. QuickPLS Pro regression IPMA guide.
Set ranges from the measurement
Suppose an analyst uses a continuous satisfaction score and two hypothetical predictors: resolution quality graded 0–10, and unresolved handoffs per case on a defined 0–10 scale. Higher quality is better; more handoffs are worse. The ranges come from the way the measures are defined, not merely this month's sample minima and maxima. If a real measure has no defensible upper limit, do not invent one for the plot. Reconsider the measure or report the limitation.
Open Analyze… → Regression and choose Ordinary least squares. Set the target outcome, predictors and any justified controls. Under Importance-performance analysis, turn on Include regression IPMA. In the range editor, give each predictor and control meaningful bounds that cover the observed values. Specify any reversed performance interpretation. Run the equation and check coefficients, uncertainty and fit before relying on the map.
Work the coordinates on paper
These illustrative numbers explain the map; they are not desktop output or values from the generic workshop.
| Hypothetical predictor | Mean, 0–10 | Signed coefficient | Direct performance position |
|---|---|---|---|
| Resolution quality | 4 | +0.30 | 40 |
| Unresolved handoffs | 2 | −0.40 | 20 |
Resolution-quality performance is 100 × (4 − 0)/(10 − 0) = 40. Importance stays at +0.30 outcome units per quality point. It does not become 30 just because the other axis uses 0–100. Mean quality of four also does not mean every customer had the same experience. If the issue is concentrated in one channel, inspect the distribution across channels.
If higher performance represents fewer handoffs, a reversed display places the mean at 100 − 20 = 80. The coefficient for the original count is still −0.40. If you recode the predictor and refit, the coefficient reflects the new coding. Check the underlying variable and units in the supporting tables rather than treating reverse display as a model change.
Compare feasible changes rather than ranking raw coefficients
If resolution quality were expressed on 0–100 instead of 0–10, ten new units would represent one original point. Its coefficient would be +0.03 per new point instead of +0.30 per original point, yet the fitted relationship would not change. Sorting unstandardized coefficients is therefore not a unit-free ranking. When comparing options, describe feasible changes in their original measures and the associated fitted differences, together with uncertainty.
Read the three supporting tables and the paired map. Confirm sample, signs, coefficient units, bounds and orientation. High positive importance with room to improve deserves a closer look, but the map inherits the underlying regression's limitations. Omitted influences can affect both a service measure and customer satisfaction. The map does not establish how a feasible intervention would change the outcome.
Try it: Keep the resolution mean at 4 but enter bounds 2–8. Performance becomes 33.3 instead of 40 even though the observations have not changed. Explain the endpoints in your report before comparing performance scores.
Example conclusion: “Resolution quality showed room to improve on its defined scale and a positive conditional association with satisfaction. We would inspect uncertainty and operational causes before acting on the map.”