App workflows and reporting

Save a named QuickPLS report that still points to the right calculation

You have a baseline PLS-SEM fit and a second run after changing the model. Both are in the same QuickPLS project. The research team asks for the baseline result, so you open the project and save a report. The critical choice happens before the save: which completed calculation is selected?

A saved report records a selected result. It does not recalculate the current model. The name you give the report makes it easier to find later, but the name alone does not tell QuickPLS which dataset, model or calculation to use. That distinction is especially useful when a thesis or paper is revised and old results must remain accessible.

Set up a report you can check

Use the first PLS-SEM study if you want to practise. Its customer-experience.csv file contains 240 synthetic cases. The baseline has three paths: Quality → Satisfaction, Trust → Satisfaction and Satisfaction → Loyalty. Run it once using the documented settings, or use your own completed result if you already have one. Keep the practice case separate from the 344-case Corporate Reputation sample, even though both contain a satisfaction-to-loyalty path.

  1. Save the project. In Results, use the Result dropdown to select the completed baseline calculation. Check the model and dataset, and use the results summary to confirm the analysed case count. If a run is still in progress or didn't finish successfully, stop rather than preparing a report from a different result.
  2. With that completed result selected, choose File → Save Report…. Enter a descriptive Saved report name, such as Customer experience — baseline PLS — 240 cases. For a series of revisions, keep the naming convention stable enough that a co-author can distinguish a baseline from a planned check.
  3. Under Result source, open Source details. The official reporting guide identifies the checks as Result, Method, Completed, Model and Dataset. Look at all five, then choose Save report. If the source is wrong, switch results before saving. Renaming a mistaken report will not repair its source link.
  4. Save the project again. The report belongs to that saved project. A spreadsheet export, a PDF or a screenshot can be shared separately, but it is not a substitute for locating the calculation in the project.
QuickPLS saved CB-SEM moderator report with result search, output navigation, parameter estimates and Export button
A saved CB-SEM report. Check the result name and use Export… in the top toolbar to choose the output file.

Reopen it as someone else would

Use File → Open Project… to reopen the file you just saved. In Project Explorer, expand Reports. Double-click the report or select Open Report from its context menu, as documented. Check the report source. Then find the completed calculation in Results and locate one named estimate that proves you know which run you are comparing. For the 240-case baseline, the checked point estimate for Satisfaction → Loyalty is about 0.647. The reference compares QuickPLS calculation code with cSEM; it does not verify the desktop run you have just completed. Compare your own result with it. For this report exercise, first confirm that the reopened report points to the calculation you selected.

If you changed a model since the baseline, repeat the procedure on the revised completed calculation and save a different report name. Write one line explaining the reason for the change. “Baseline with all 240 cases” and “Revised model adding a direct Quality → Loyalty path” are useful descriptions if they reflect what you actually ran. Do not report a comparison until you can identify both sources and any differences in settings or cases.

Try to catch a wrong source on purpose

Consider a project with a baseline result and a bootstrap result. You highlight the bootstrap result, then type Baseline report as the new report name. Which tells you whether you are about to save the right one? Read Method and Result under Source details. A baseline-style report name is just text; those source fields tell you which calculation the report will describe. Cancel or switch to the correct completed result and try again.

When you share an authorised report, also keep the project and one short record of the source. It can be as simple as the dataset filename, version, analysed case count, model name and run settings. A saved project may include the underlying data, so check what you are permitted to share before sending the project itself.

Related articles